For Non-Residential projects, fees and the need for additional water are computed on the projected Water Use Capacity as determined by Rule 24, Table 2, Non-Residential Water Use Factors. See Rule 24-B for details.
MPWMD Rule 24 Table 2: Non-Residential Water Use Factors